Good afternoon,

I've been trying to use ms flow to dynamically update documents in Google Spreadsheets.

While I'm directly typing my file ID and my Sheet ID, it works (figure 1), but when I try it by using anything dynamic, such as the Compose connector, it doesn't (figure 2). Why is that? Would it be possible if I design my own connector, using the Google API and use these values as parameters? Looks like Ms Flow doesn't even try to check if the contents from Compose are valid.

Thank you for your time!



1.JPGFigure 12.JPGFigure 2


1 ACCEPTED SOLUTION

Accepted Solutions
Community Support Team
Community Support Team

Re: Help with Dynamic values in connectors

Hi @jcobiak ,

 

I have some updates for you.

 

Dynamic contents in Insert row action is not supposed to work because of the reason as displayed in the error message. The token is using the compose outputs are expressions which evaluate only at runtime – so during design time i.e. when the flow is being created, the values of outputs are not available.

 

The user must either select from the dropdown or type in the correct value in those fields for dynamic values to work during design time.

 

Best regards,

Mabel

 

Community Support Team _ Mabel Mao
If this post helps, then please consider Accept it as the solution to help the other members find it more quickly.
4 REPLIES 4
Super User
Super User

Re: Help with Dynamic values in connectors

@jcobiak 

Hi there!  My understanding is that for this (and the Excel version), the file must be selected using the folder select icon rather than typing in a file path.

 

I tested out a version where I got the list of Google Sheets first and then used the File ID in insert row action, but since the worksheet is dependent on the filename, I know it will yell at me if I don't select a file.

 

Hope that helps.

-Ed-

 

 

If this reply has answered your question or resolved your challenge, please consider marking it as a Solution. This helps other users find it more easily via search.

jcobiak
Level: Powered On

Re: Help with Dynamic values in connectors

@edgonzales ,
Thank you for your response. 

Hi there!  My understanding is that for this (and the Excel version), the file must be selected using the folder select icon rather than typing in a file path.

It's possible to select the file directly typing in a file path, the problem shows up when I try to use dynamic content.

I tested out a version where I got the list of Google Sheets first and then used the File ID in insert row action, but since the worksheet is dependent on the filename, I know it will yell at me if I don't select a file.

Yeah, I've tried something along these lines, but it didn't work. I am able to use dynamic content while getting the lists in Google Sheets, but still, I'm not able to pass these values to the "Add row" command. You can see (figure 4) that it does get the sheet name, as output, but I can't apply it (Figure 3).

3.JPGFigure 34.JPGFigure 4

Community Support Team
Community Support Team

Re: Help with Dynamic values in connectors

Hi @jcobiak ,

 

Thanks for feedback.

 

The issue could be reproduced by me. It seems that dynamic sheet id and dynamic file if cannot be used in action Insert row.

1.PNG

 

I will help report this issue from my side and back to you later.

 

Best regards,

Mabel

 

Community Support Team _ Mabel Mao
If this post helps, then please consider Accept it as the solution to help the other members find it more quickly.
Community Support Team
Community Support Team

Re: Help with Dynamic values in connectors

Hi @jcobiak ,

 

I have some updates for you.

 

Dynamic contents in Insert row action is not supposed to work because of the reason as displayed in the error message. The token is using the compose outputs are expressions which evaluate only at runtime – so during design time i.e. when the flow is being created, the values of outputs are not available.

 

The user must either select from the dropdown or type in the correct value in those fields for dynamic values to work during design time.

 

Best regards,

Mabel

 

Community Support Team _ Mabel Mao
If this post helps, then please consider Accept it as the solution to help the other members find it more quickly.

Helpful resources

Announcements
firstImage

Microsoft Flow Online Conference

Join us for a FULL day of FREE Microsoft Flow Sessions from some of the best minds in the industry!

firstImage

Watch Sessions On Demand!

Continue your learning in our online communities.

Power Platform 2019 Release Wave 2 Plan

Power Platform 2019 Release Wave 2 Plan

Features releasing from October 2019 through March 2020

thirdimage

Flow Community User Group Member Badge

Fill out a quick form to claim your user group badge now!

thirdImage

New Flow Community Board!

Check out the new Microsoft Flow Community Blog Topic Suggestion board!

fifthimage

Microsoft Learn

Learn how to build the business apps that you need

sixthImage

Power Platform World Tour

Find out where you can attend!

seventhimage

Webinars & Video Gallery

Watch & learn from the Flow Community Video Gallery!

Top Kudoed Authors
Users Online
Currently online: 53 members 4,251 guests
Please welcome our newest community members: