formatDateTime to ISO 8061 format for Create Event (V2)

Hi, all.

 

I have created a flow that takes data from an email and converts it to a calendar entry. The email formats the date using UK format (dd/MM/yyyy hh:mm:ss). I have used various Compose and Split functions to break the email body into the constituent parts resulting in the Date and Time being held in an output called Compose_End_Date_and_Time_(Split). 

 

In the Create Event (V2) function, I originally added outputs('Compose_End_Date_and_Time_(Split)')[1]) to the End Date and Time parameter and although this works if I enter a date such as 02/12/2017 11:59:00 it ends up going into 12th February instead of 2nd December. Enter a date like 27/11/2017/ 17:00:00 and it fails entirely.

 

I have tried to update it to use formatDateTime and reformat the incoming date and time value to UK but it won't work. Can somebody point me in the right direction please?

 

 

1 ACCEPTED SOLUTION

Accepted Solutions
Dual Super User
Dual Super User

Re: formatDateTime to ISO 8061 format for Create Event (V2)

Hi!

You can keep on splitting the date (first separating date from time; then separating day/month/year and finally rebuilding the date in the desired format), but let's hope Microsoft Flow Support team can lead us into a more reasonable solution.

 

If not, this is my ugly proposal, taking the example 27/11/2017 17:00:00

split(outputs('Compose_End_Date_and_Time_(Split)')[1]),' ')[0]  will provide 27/11/2017

 

split(split(outputs('Compose_End_Date_and_Time_(Split)')[1]),' ')[0],'/') will provide the following array ["27","11","2017"]

 

concat(split(split(outputs('Compose_End_Date_and_Time_(Split)')[1]),' ')[0],'/')[1],'/',split(split(outputs('Compose_End_Date_and_Time_(Split)')[1]),' ')[0],'/')[0],'/',split(split(outputs('Compose_End_Date_and_Time_(Split)')[1]),' ')[0],'/')[2]) will provide 11/27/2017

 

I haven't tested the expressions myself, let's hope I haven't forgot any parenthesis comma, single quote, etc.





If anyone is trying to help you with an issue, the fastest way to say thanks is by kudoing. Be grateful, Thumbs up!

Proud to be a Flownaut!





View solution in original post

7 REPLIES 7
Dual Super User
Dual Super User

Re: formatDateTime to ISO 8061 format for Create Event (V2)

Hi!

You can keep on splitting the date (first separating date from time; then separating day/month/year and finally rebuilding the date in the desired format), but let's hope Microsoft Flow Support team can lead us into a more reasonable solution.

 

If not, this is my ugly proposal, taking the example 27/11/2017 17:00:00

split(outputs('Compose_End_Date_and_Time_(Split)')[1]),' ')[0]  will provide 27/11/2017

 

split(split(outputs('Compose_End_Date_and_Time_(Split)')[1]),' ')[0],'/') will provide the following array ["27","11","2017"]

 

concat(split(split(outputs('Compose_End_Date_and_Time_(Split)')[1]),' ')[0],'/')[1],'/',split(split(outputs('Compose_End_Date_and_Time_(Split)')[1]),' ')[0],'/')[0],'/',split(split(outputs('Compose_End_Date_and_Time_(Split)')[1]),' ')[0],'/')[2]) will provide 11/27/2017

 

I haven't tested the expressions myself, let's hope I haven't forgot any parenthesis comma, single quote, etc.





If anyone is trying to help you with an issue, the fastest way to say thanks is by kudoing. Be grateful, Thumbs up!

Proud to be a Flownaut!





View solution in original post

fordwayrichardg
Level: Powered On

Re: formatDateTime to ISO 8061 format for Create Event (V2)

Thanks efialttes. I had already thought about sub-splitting the string but it is not elegant as you say.

The fact that the number is accepted as-is without formatDateTime suggests that the string is okay. It's just a case of figuring out what I have done wrong with the formatDateTime function (I hope).

Dual Super User
Dual Super User

Re: formatDateTime to ISO 8061 format for Create Event (V2)

Indeed. Let's hope there is finally no need for subsplitting 😄





If anyone is trying to help you with an issue, the fastest way to say thanks is by kudoing. Be grateful, Thumbs up!

Proud to be a Flownaut!





Community Support Team
Community Support Team

Re: formatDateTime to ISO 8061 format for Create Event (V2)

Hi @fordwayrichardg,

 

Do you want to format your UK format date time into ISO format with formatDateTime() function?

Could you please share a bit more about your formatDateTime() formula?

 

I think there is something wrong with the usage of formatDateTime() function on your side. The first parameter of formatDateTime() function requires a datetime string which match ISO 8601 format (‘o’), but date time string ‘27/11/2017/ 17:00:00’ that you provided could not match standard ISO 8601 format, the default format of the required datetime string is ‘MM/dd/yyyy HH:mm:ss’.

 

More details about formatDateTime() function, please check the following article:

formatDateTime() function

 

Best regards,

Kris

Community Support Team _ Kris Dai
If this post helps, then please consider Accept it as the solution to help the other members find it more quickly.
Dual Super User
Dual Super User

Re: formatDateTime to ISO 8061 format for Create Event (V2)

Hi!

Then, string manipulation (subsplitting, etc.) is the only chance in this case, right?

Thank you in advance!

 





If anyone is trying to help you with an issue, the fastest way to say thanks is by kudoing. Be grateful, Thumbs up!

Proud to be a Flownaut!





fordwayrichardg
Level: Powered On

Re: formatDateTime to ISO 8061 format for Create Event (V2)

Hi Kris.

 

This is the exact formula I have at the moment:

formatdatetime(outputs('Compose_End_Date_and_Time_(Split)')[1],'dd/MM/yyyy hh:mm:ss')
 
Are you saying, therefore, that the string parameter at the end, 'dd/MM/yyyy hh:mm:ss' is not for telling formatDateTime the format that the incoming string is in but actually for determining the output format? If so, efialttes suggestion of using sub-string splitting may be the only option #SadFace.
fordwayrichardg
Level: Powered On

Re: formatDateTime to ISO 8061 format for Create Event (V2)

Well in spite of a better solution, I have gone with the suggestion of efialttes and I have setup some split steps to break-down the date and time and then rebuild it. The Flow works so thank you very much for the suggestions and solution.

Helpful resources

Announcements
thirdimage

Power Automate Community User Group Member Badge

Fill out a quick form to claim your user group badge now!

firstImage

Incoming: New and improved badges!

We've given our badges an overhaul and also added some brand new ones!

fifthimage

Microsoft Learn

Learn how to build the business apps that you need.

sixthImage

Power Platform World Tour

Find out where you can attend!

seventhimage

Webinars & Video Gallery

Watch & learn from the Power Automate Community Video Gallery!

Top Kudoed Authors (Last 30 Days)
Users online (5,215)