cancel
Showing results for 
Search instead for 
Did you mean: 
Reply
Sheridanms
Level: Powered On

Re: When is PowerApps coming to Government Tenants ?

Confirmed. PowerApps landed about 45 minutes ago for our GCC tenant. Initially I had trouble with sign in on mobile app. I kept inputting credentials and getting redirected to signup for Trial plan experience. Then I noticed a small gear in the lower right of the IOS screen. After selecting "Enable GCC mode" everything worked as expected.

 

PowerApps screenshot GCC start@.5x.png

StephenF
Level: Powered On

Re: When is PowerApps coming to Government Tenants ?

Wow, that definitely fixed a lot of things. Thank you so much!

dtedwards
Level: Powered On

Re: When is PowerApps coming to Government Tenants ?

Both environments seem to be up and running now.

 

Now the new issue is that I can't see Dynamics 365 to set up a connection...

PowerApps Staff EvanChakiMSFT
PowerApps Staff

Re: When is PowerApps coming to Government Tenants ?

Can you see Common Data Service as a connector?

dtedwards
Level: Powered On

Re: When is PowerApps coming to Government Tenants ?

Yes I can. I am able to create a connection using CDS, but when I try to use it as a Data Source within PowerBI I get an error.

 

The environment 'Default-3a573c9f-610e-4237-9520-c8291dad5888' is not linked to a new CDS 2.0 instance. The operation 'ListInstanceMetadata' is forbidden for unlinked environments.

Session ID: ad95240f-ee62-423e-b366-1bfc18bda29f

 

Regarding the Dynamics 365 Connector, I found an article that says it is not available for the GCC.

https://docs.microsoft.com/en-us/connectors/dynamicscrmonline/

 

I am able to see and use the Dynamics 365 Connector in our non-GCC PowerApps and Flow environment.

 

Helpful resources

Announcements
thirdimage

Power Automate Community User Group Member Badge

Fill out a quick form to claim your user group badge now!

sixthImage

Power Platform World Tour

Find out where you can attend!

Power Platform 2019 release wave 2 plan

Power Platform 2019 release wave 2 plan

Features releasing from October 2019 through March 2020

fifthimage

Microsoft Learn

Learn how to build the business apps that you need.

Top Kudoed Authors (Last 30 Days)
Users online (4,574)