Calculate dates forwards and backwards

I have a scheduling calculator primarily based on 3 date picker fields (Every Monday, 2nd Tuesday, and 1st&3rdTuesday).

Currently, the date is manually entered into the Every Monday date picker, the 2nd Tuesday picker calculates the 2nd Tuesday based on the date selected in the Every Monday date picker, and the 1st&3rdTuesday date picker is calculated based on the date that gets calculated in the 2nd Tuesday date picker.

 

I'd like for the user to be able to enter in EITHER the Every Monday or the 1st&3rdTuesday date picker, and calculate the dates either way. However, when I've attempted this using an IF statement in both the Every Monday and 1st&3rdTuesday date pickers (once with the IF statement in only one date picker and another time with the IF statement in both) and I get a circular reference error.

 

Is it possible to accomplish what I need or will I have to find a workaround?

ljkeefe_0-1639611092199.png

 

7 REPLIES 7
EddieE
Super User
Super User

@Anonymous 

I haven't tested this but you can probably use variable in the OnChange of the DatePickers, eg

 

Every Monday DP: OnChange : 

Set( vEveryMonday, dpEveryMonday.SelectedDate); Set( v1st_3rd_Tuesday, Blank())

 

1st and 3rd Tuesday DP: OnChange: 

Set( vEveryMonday, Blank()); Set( v1st_3rd_Tuesday, dp1st_3rdTuesday.SelectedDate)

 

Then use your If() statements using these variables, checking for IsBlank() first.

 

 

 


If my response solves your question, please accept as a solution.
Thank you!
Anonymous
Not applicable

Thanks, @EddieE . I've tried the variables and I'm still receiving the circular error. If I understood correctly, I place the variables in each of the control's OnChange properties, then use them in the DefaultDate properties of each control's If statements.

@Anonymous 

Can you please share the formulas you are using on your datepickers


If my response solves your question, please accept as a solution.
Thank you!

@Anonymous 

After having a quick play I think this should do what you want. You will just have to add Dyas between dates to suit your needs.

 

- Add a DatePicker, call it FirstMonday, then set these properties

// OnChange
Set( vEveryMonday, FirstMonday.SelectedDate); 
Set( v1st_3rd_Tuesday, DateAdd( vEveryMonday, 8, Days));

// DefaultDate
vEveryMonday

 

- Add a second DatePicker, call it SecondTuesday, then set it's properties

// OnChange
Set( v1st_3rd_Tuesday, SecondTuesday.SelectedDate);
Set( vEveryMonday, DateAdd( v1st_3rd_Tuesday, -8, Days)); 

// DefaultDate
v1st_3rd_Tuesday

 

The dates and variables don't make sense but hopefully you can work it out? Basically, if a user picks a Monday, the Tuesday DatePicker is set to +8days past that date. Then, if a user picks a Tuesday, the Monday is set to -8 days before that date.

 

It works in my testing so hopefully this will do what you need.


If my response solves your question, please accept as a solution.
Thank you!
Anonymous
Not applicable

@EddieE  Thank you for your reply. Sorry, for the delayed response, I've been on vacation. I tried your suggested formula and it gave me the red underlines. Also, I'm pretty sure setting -8 days will not work because the calendar days change so much. This is the code I have on the Default Date property of the 1st&3rdTuesday date picker, which is currently dependent on the date picking in the Every Monday picker. I hope that makes sense.

With(
    {
        FirstOfMonth: Date(
            Year(1stTuesdayDatePicker.SelectedDate),
            Month(1stTuesdayDatePicker.SelectedDate),
            1
        ),
        DayOfWeek: 3,
        N: 1
    },
    With(
        {
            FirstTuesday: DateAdd(
                FirstOfMonth,
                (N * 7) - Weekday(
                    DateAdd(
                        FirstOfMonth,
                        7 - DayOfWeek
                    )
                )
            )
        },
        With(
            {
                SecondOfMonth: Date(
                    Year(2and4Tuesday.SelectedDate),
                    Month(2and4Tuesday.SelectedDate),
                    1
                ),
                DayOfWeekSS: 3,
                NSS: 2
            },
            With(
                {
                    SecondTuesSS: DateAdd(
                        SecondOfMonth,
                        (NSS * 7) - Weekday(
                            DateAdd(
                                SecondOfMonth,
                                7 - DayOfWeekSS
                            )
                        )
                    )
                },
                With(
                    {
                        FourthOfMonth: Date(
                            Year(2and4Tuesday.SelectedDate),
                            Month(2and4Tuesday.SelectedDate),
                            1
                        ),
                        DayofWeekFS: 3,
                        NFS: 4
                    },
                    With(
                        {
                            FourthTuesSS: DateAdd(
                                FourthOfMonth,
                                (NFS * 7) - Weekday(
                                    DateAdd(
                                        FourthOfMonth,
                                        7 - DayofWeekFS
                                    )
                                )
                            )
                        },
                        With(
                            {
                                FirstOfMonthCC: Date(
                                    Year(2and4Tuesday.SelectedDate),
                                    Month(2and4Tuesday.SelectedDate),
                                    1
                                ),
                                DayOfWeekCC: 3,
                                NCC: 1
                            },
                            With(
                                {
                                    FirstTuesCC: DateAdd(
                                        FirstOfMonthCC,
                                        (NCC * 7) - Weekday(
                                            DateAdd(
                                                FirstOfMonthCC,
                                                7 - DayOfWeek
                                            )
                                        )
                                    )
                                },
                                With(
                                    {
                                        ThirdOfMonth: Date(
                                            Year(2and4Tuesday.SelectedDate),
                                            Month(2and4Tuesday.SelectedDate),
                                            1
                                        ),
                                        DayOfWeekSS3: 3,
                                        N3SS: 3
                                    },
                                    With(
                                        {
                                            ThirdTuesSS: DateAdd(
                                                ThirdOfMonth,
                                                (N3SS * 7) - Weekday(
                                                    DateAdd(
                                                        ThirdOfMonth,
                                                        7 - DayOfWeekSS3
                                                    )
                                                )
                                            )
                                        },
                                        If(
                                            IsBlank('EveryMondayDatePicker'),
                                            "",
                                            IsBlank(2and4Tuesday),
                                            DateAdd(
                                                DateAdd(
                                                    FirstOfMonth,
                                                    1,
                                                    Months
                                                ),
                                                (N * 7) - Weekday(
                                                    DateAdd(
                                                        DateAdd(
                                                            FirstOfMonth,
                                                            1,
                                                            Months
                                                        ),
                                                        7 - DayOfWeek
                                                    )
                                                )
                                            ),
                                            2and4Tuesday.SelectedDate = SecondTuesSS,
                                            DateAdd(
                                                DateAdd(
                                                    FirstOfMonthCC,
                                                    1,
                                                    Months
                                                ),
                                                (NCC * 7) - Weekday(
                                                    DateAdd(
                                                        DateAdd(
                                                            FirstOfMonthCC,
                                                            1,
                                                            Months
                                                        ),
                                                        7 - DayOfWeekCC
                                                    )
                                                )
                                            ),
                                            2and4Tuesday.SelectedDate = FourthTuesSS,
                                            DateAdd(
                                                DateAdd(
                                                    ThirdOfMonth,
                                                    1,
                                                    Months
                                                ),
                                                (N3SS * 7) - Weekday(
                                                    DateAdd(
                                                        DateAdd(
                                                            ThirdOfMonth,
                                                            1,
                                                            Months
                                                        ),
                                                        7 - DayOfWeekSS
                                                    )
                                                )
                                            )
                                        )
                                    )
                                )
                            )
                        )
                    )
                )
            )
        )
    )
)

  

@Anonymous 

I hope you had a nice break 🙂

 

When I put your code into a DatePicker I can see those red lines. If you look closely at them , you'll see that these lines don't highlight the NUMERAL at the start of your DatePickers. This is the clue you need.

 

You cannot start control names with numbers, PowerApps doesn't like it. To fix this, I changed the DatePickers to FirstTuesdayDatePicker and Secondand4Tuesday respectively. Then I went through the code above and change that accordingly and the errors go away ... however ... The code picks 1-Feb-2022 no matter what I select for 1st Monday so I think you'll need to work on that.

 

Lastly, I'm not a huge fan of large complex With() statements, they tend to go against the whole "Low-Code" mantra and in this instance can create far more complexity than is needed, IMO. I guess though, if you are happy using this code format - go for it 🙂


If my response solves your question, please accept as a solution.
Thank you!
Anonymous
Not applicable

@EddieE Thanks, Eddie. I'll give it a shot. I am not a fan of the large complex With statements but it's the only solution that I could find that would calculate the nth days of the month. I have one meeting that is every Monday, the preceding meeting is only on the first Tuesday of the month, then the next meeting is on the second and fourth Tuesday of the month, and the last meeting for approvals is on the first Tuesday and third Tuesday of the month.  The meetings have to be conducted in that order so depending on when the user can get into the first meeting will determine their path forward. However, some users find it easier to plan the LAST meeting, usually due to other deadlines or restraints, and then calculate the meetings backward. This is what I was trying to accomplish. If you have a simpler way to get the Nth days of the month than using With statements, I'm happy to entertain it. I am still relatively new to PowerApps so every step is a learning step for me. 

Helpful resources

Announcements

Community will be READ ONLY July 16th, 5p PDT -July 22nd

Dear Community Members,   We'd like to let you know of an upcoming change to the community platform: starting July 16th, the platform will transition to a READ ONLY mode until July 22nd.   During this period, members will not be able to Kudo, Comment, or Reply to any posts.   On July 22nd, please be on the lookout for a message sent to the email address registered on your community profile. This email is crucial as it will contain your unique code and link to register for the new platform encompassing all of the communities.   What to Expect in the New Community: A more unified experience where all products, including Power Apps, Power Automate, Copilot Studio, and Power Pages, will be accessible from one community.Community Blogs that you can syndicate and link to for automatic updates. We appreciate your understanding and cooperation during this transition. Stay tuned for the exciting new features and a seamless community experience ahead!

Check Out | 2024 Release Wave 2 Plans for Microsoft Dynamics 365 and Microsoft Power Platform

On July 16, 2024, we published the 2024 release wave 2 plans for Microsoft Dynamics 365 and Microsoft Power Platform. These plans are a compilation of the new capabilities planned to be released between October 2024 to March 2025. This release introduces a wealth of new features designed to enhance customer understanding and improve overall user experience, showcasing our dedication to driving digital transformation for our customers and partners.    The upcoming wave is centered around utilizing advanced AI and Microsoft Copilot technologies to enhance user productivity and streamline operations across diverse business applications. These enhancements include intelligent automation, AI-powered insights, and immersive user experiences that are designed to break down barriers between data, insights, and individuals. Watch a summary of the release highlights.    Discover the latest features that empower organizations to operate more efficiently and adaptively. From AI-driven sales insights and customer service enhancements to predictive analytics in supply chain management and autonomous financial processes, the new capabilities enable businesses to proactively address challenges and capitalize on opportunities.    

Summer of Solutions | Week 3 Results | Win free tickets to the Power Platform Conference

We are excited to announce the Summer of Solutions Challenge!   This challenge is kicking off on Monday, June 17th and will run for (4) weeks.  The challenge is open to all Power Platform (Power Apps, Power Automate, Copilot Studio & Power Pages) community members. We invite you to participate in a quest to provide solutions in the Forums to as many questions as you can. Answers can be provided in all the communities.    Entry Period: This Challenge will consist of four weekly Entry Periods as follows (each an “Entry Period”)   - 12:00 a.m. PT on June 17, 2024 – 11:59 p.m. PT on June 23, 2024 - 12:00 a.m. PT on June 24, 2024 – 11:59 p.m. PT on June 30, 2024 - 12:00 a.m. PT on July 1, 2024 – 11:59 p.m. PT on July 7, 2024 - 12:00 a.m. PT on July 8, 2024 – 11:59 p.m. PT on July 14, 2024   Entries will be eligible for the Entry Period in which they are received and will not carryover to subsequent weekly entry periods.  You must enter into each weekly Entry Period separately.   How to Enter: We invite you to participate in a quest to provide "Accepted Solutions" to as many questions as you can. Answers can be provided in all the communities. Users must provide a solution which can be an “Accepted Solution” in the Forums in all of the communities and there are no limits to the number of “Accepted Solutions” that a member can provide for entries in this challenge, but each entry must be substantially unique and different.    Winner Selection and Prizes: At the end of each week, we will list the top ten (10) Community users which will consist of: 5 Community Members & 5 Super Users and they will advance to the final drawing. We will post each week in the News & Announcements the top 10 Solution providers.  At the end of the challenge, we will add all of the top 10 weekly names and enter them into a random drawing.  Then we will randomly select ten (10) winners (5 Community Members & 5 Super Users) from among all eligible entrants received across all weekly Entry Periods to receive the prize listed below. If a winner declines, we will draw again at random for the next winner.  A user will only be able to win once overall. If they are drawn multiple times, another user will be drawn at random.  Individuals will be contacted before the announcement with the opportunity to claim or deny the prize.  Once all of the winners have been notified, we will post in the News & Announcements of each community with the list of winners.   Each winner will receive one (1) Pass to the Power Platform Conference in Las Vegas, Sep. 18-20, 2024 ($1800 value). NOTE: Prize is for conference attendance only and any other costs such as airfare, lodging, transportation, and food are the sole responsibility of the winner. Tickets are not transferable to any other party or to next year’s event.   ** PLEASE SEE THE ATTACHED RULES for this CHALLENGE**   Week 1 Results: Congratulations to the Week 1 qualifiers, you are being entered in the random drawing that will take place at the end of the challenge. Community MembersNumber of SolutionsSuper UsersNumber of Solutions @anandm08  23 @WarrenBelz  31 @DBO_DV  10 @Amik  19 AmínAA 6 @mmbr1606  12 @rzuber  4 @happyume  7 @Giraldoj  3@ANB 6 (tie)   @SpongYe  6 (tie)     Week 2 Results: Congratulations to the Week 2 qualifiers, you are being entered in the random drawing that will take place at the end of the challenge. Community MembersSolutionsSuper UsersSolutions @anandm08  10@WarrenBelz 25 @DBO_DV  6@mmbr1606 14 @AmínAA 4 @Amik  12 @royg  3 @ANB  10 @AllanDeCastro  2 @SunilPashikanti  5 @Michaelfp  2 @FLMike  5 @eduardo_izzo  2   Meekou 2   @rzuber  2   @Velegandla  2     @PowerPlatform-P  2   @Micaiah  2     Week 3 Results: Congratulations to the Week 3 qualifiers, you are being entered in the random drawing that will take place at the end of the challenge.   Week 3:Community MembersSolutionsSuper UsersSolutionsPower Apps anandm0861WarrenBelz86DBO_DV25Amik66Michaelfp13mmbr160647Giraldoj13FLMike31AmínAA13SpongYe27  

Updates to Transitions in the Power Platform Communities

We're embarking on a journey to enhance your experience by transitioning to a new community platform. Our team has been diligently working to create a fresh community site, leveraging the very Dynamics 365 and Power Platform tools our community advocates for.  We started this journey with transitioning Copilot Studio forums and blogs in June. The move marks the beginning of a new chapter, and we're eager for you to be a part of it. The rest of the Power Platform product sites will be moving over this summer.   Stay tuned for more updates as we get closer to the launch. We can't wait to welcome you to our new community space, designed with you in mind. Let's connect, learn, and grow together.   Here's to new beginnings and endless possibilities!   If you have any questions, observations or concerns throughout this process please go to https://aka.ms/PPCommSupport.   To stay up to date on the latest details of this migration and other important Community updates subscribe to our News and Announcements forums: Copilot Studio, Power Apps, Power Automate, Power Pages

Top Solution Authors
Top Kudoed Authors
Users online (4,991)