Hi Experts,
Is there a way to deploy schedule board changes into different environment or those needs to be done manually into each environment. we have done below changes on schedule boards in our development environment.
Can these be exported as a part of solution or we will to do these changes manually into each different environments(Test, UAT).
Thanks,
Mahesh
User | Count |
---|---|
259 | |
108 | |
95 | |
57 | |
40 |