Gantt Chart or MS Project

Hello, is it possible to create a Gantt chart or even better to have the MS Project functionality?

Thanks

1 ACCEPTED SOLUTION

Accepted Solutions
KickingApps
Skilled Sharer
Skilled Sharer

I have created a Gantt within a PowerApp utizlizing the table function.  Take a look; if this interests you, I can provide more info.Gantt.JPG

View solution in original post

17 REPLIES 17
v-yamao-msft
Community Support
Community Support

Hi Omarsalgado,

 

It seems that currently we can only use Column chart, Pie chart, Line chart on PowerApps. There is no available control for Gantt chart.

 

If convenience, please submit an idea at PowerApps Ideas Forum, hope it could be considered as future releases:
https://powerusers.microsoft.com/t5/PowerApps-Ideas/idb-p/PowerAppsIdeas

 

Best regards,
Mabel Mao

Community Support Team _ Mabel Mao
If this post helps, then please consider Accept it as the solution to help the other members find it more quickly.

There is no Gantt Chart, but I can think of a work-around. 

Below is a screenshot of an App in which I repeat a colored Button inside the Gallery. For your purposes, you can think of the colored Button as the progress bar of a project in a Gantt Chart.

2017-03-08.png

 

 I haven't done this myself, but if I were to, here's what I would do:

  1. Create Gallery1 as a vertical gallery.
  2. Set Gallery1.Items to a database of Projects with a column for ProjectName, StartDate, and End Date or however you want to name them.
  3. Create a static database of dates for the year, "Dates." This is easily done in Excel with fill-down. This is used to show dates for the Gantt Chart.
  4. Add horizontal gallery, Gallery2, inside Gallery1 so that Gallery2 is nested into Gallery1.
  5. Set Gallery2 to Dates. I recommend adding two date pickers to Filter Gallery2 to restrict the view to a given start and end date.
    Filter(Dates,
    	date>=DatePicker1.SelectedDate &&
    	date<=DatePicker2.SelectedDate
    )
  6. Add Button1 inside Gallery2. I use Button since it is rounded, has text, and has a hover color already programmed. 
  7. Set Button1 properties to fill the space in Gallery2:
    Button1.X: 0
    Button1.Y: 0
    Button1.Width: Parent.TemplateWidth
    Button1.Height: Parent.TemplateHeight
    (Optional): If you want the bars of your Gantt to be continuous without a gap, set this property:
    Gallery2.TemplatePadding: 0
  8. It should look something like this now:
    2017-03-08 (2).png

      

  9. Now that you have Button1 repeated for every date as a makeshift bar, you need to restrict it to be visible if and only if its corresponding date falls between StartDate and EndDate of Gallery1.

    This part is tricky because Button2 needs to reference the StartDate and EndDate of the record in Parent Gallery1. Unfortunately, PowerApps doesn't let you reference the Parent gallery data from within the Child gallery--it's complicated. So my work around is to carry over the variables by adding a column that returns true/false if the date falls between the StartDate and EndDate of the project:
    AddColumns(
    	Filter(Dates,
    		date>=DatePicker1.SelectedDate &&
    		date<=DatePicker2.SelectedDate
    	),
    	"vis",date>=ThisItem.StartDate && date<=ThisItem.EndDate
    )
  10. Now you can set Button1.Visible to only show up if the "vis" column is true:
    Button1.Visible:
    ThisItem.vis
  11. Summary: You have Gallery1 which is going to show all the projects as normal. Gallery2 is nested inside Gallery1. It will be replicated for each project to show a range of general calendar dates. You can restrict the dates in Gallery2 to those between DatePicker1 and DatePicker2. Button1, which is inside Gallery2, is Visible when a given calendar date presides between the StartDate and EndDate of a project. In this way, it shows duration.

 

2017-03-08 (3).png

The final step is to have another database in which you record changes to status of a project, or what has been completed. Then you can do complicated things like changing the Fill of Button1 so that it is colored differently based on what has been done/not done.

Microsoft Employee
@8bitclassroom
Anonymous
Not applicable

 

 

Hi guys,

 

I'm strangling with a problem in PowerApp. I built an App that consums info from a sharepoint list and at the same time I built a Gantt view of that list in Power BI. When I connect both lsit and tile in Power Apps, the tile of the Gantt doesn't display. I believe this is connected to the fact the Gantt visualization is not predefined and I imported it from the store.

1.JPG

 Here is a screenshot of the tile in the dashboard inside Power BI. Everything runs perflectly. In addition I have a Waterfall visual in this dashboard, and when I connect this tile to the Power App , it runs . 

2.JPG

 Here we can see the PowerApp running with the visual that is native of Power BI

3.JPG

 Can anyone suggest a workaround on this problem, or is there an feature I need to enable so the gantt visualization run on PowerApps?

 

Thanks .

 

Thanks so much for this great workaround. I got the exact same thing but I dont know you get the line to show start and end of the week. Can you share your method please?

KickingApps
Skilled Sharer
Skilled Sharer

I have created a Gantt within a PowerApp utizlizing the table function.  Take a look; if this interests you, I can provide more info.Gantt.JPG

That looks so good. Can you share how you did this or provide the project would be super useful for what am trying to build. Thanks

Anonymous
Not applicable

Yes! This is exactly what I'm looking for. Plase provide more info! How did you rotate the column chart!!??

 

Thank you,

Sorry - I have been on vacation and just saw this.  Was it the Gantt I shared that you are interested in?  If so, I will share.  Or was it the other that is in the same thread?

Anonymous
Not applicable

Thanks! I was able to achieve something similar using a Gallery, playing with the size/position & color fields . Still not as nice as the Power BI capabilities.

 

 

Helpful resources

Announcements

Back to Basics: All Ten Tuesday Tips

Our ongoing BACK TO BASICS: TUESDAY TIP series dedicated to helping both new members and seasoned veterans of our community learn and grow reached a milestone ten posts! We're excited to present this "one stop" post for each of our #TuesdayTips, making it easier to find what you're looking for and help you understand the community: from ranking and badges to profile avatars, from being a Super User to blogging in the community, and so much more. Thank you for your incredible support for this series--we are so glad it was able to help so many of you navigate your community experience.   Back to Basics Tuesday Tip #1: All About Your Community Account Find out the basics of your community account. Whether it's changing your username, updating an email address, understanding GDPR, or customizing your profile, this is the place to begin.  Community Links: ○ Power Apps ○ Power Automate ○ Power Pages ○ Copilot Studio     Back to Basics Tuesday Tip #2: All About Community Ranks Have you ever wondered how your fellow community members earn the different ranks available? What is the difference between an Advocate and a Helper, a Solution Sage and a Community Champion? In this #TuesdayTip, we share the secrets and tips to help YOU keep your ranking growing--and why it's so important to our communities. Community Links: ○ Power Apps ○ Power Automate ○ Power Pages ○ Copilot Studio     Back to Basics Tuesday Tip #3: Contributing to the Community If you need to understand how subscriptions or notifications work, how to use search to find the answers you're looking for, or editing your posts, this is the place to start. With these handy tips, you'll find what you're looking for, ask some great questions, and format your posts perfectly! Community Links: ○ Power Apps ○ Power Automate ○ Power Pages ○ Copilot Studio     Back to Basics Tuesday Tip #4: What is a Super User? Have you ever been exploring the community and come across a user with this unique icon next to their name? It means you have found the actual, real-life superheroes of the Power Platform Community! Super Users are our heroes because of the way they are consistently helpful with everything from solutions to flagging spam, offering insight on the community, and so much more! Find out more in this #TuesdayTip.   Community Links: ○ Power Apps ○ Power Automate ○ Power Pages ○ Copilot Studio     Back to Basics Tuesday Tip #5: How to Become a Community Blog Author We want YOU to be part of the community blog! Sharing your knowledge of Power Platform is an essential part of our community!  By sharing what you know and have learned with the community in the Power Platform in the community blog, you help us create a more engaged and informed community, better equipped to tackle complex challenges.  To get started with blogging across the Power Platform communities, please visit the following links. Community Links: ○Power Apps ○ Power Automate ○ Power Pages ○ Copilot Studio     Back to Basics Tuesday Tip #6 All About Community User Groups Being part of, starting, or leading a User Group can have many great benefits for our community members who want to learn, share, and connect with others who are interested in the Microsoft Power Platform and the low-code revolution. Don't wait. Get involved with (or maybe even start) a User Group today--just follow the tips below to get started. Community Links: ○ Power Apps ○ Power Automate ○ Power Pages ○ Copilot Studio     Back to Basics Tuesday Tip #7: Resources for User Groups Once you've launched your Community User Group, we are excited to have many resources available that can help you lead, engage, and grow your User Group! Whether it's access to the Microsoft Community Tenant for User Groups, help with finding speakers for your User Group meetings (both local and virtual speakers), and even finding spaces to have your meetings in--check out this #TuesdayTip to get what you need! Community Links: ○ Power Apps ○ Power Automate ○ Power Pages ○ Copilot Studio     Back to Basics Tuesday Tip #8: All About Subscriptions and Notifications Keeping track of what you want to know and how you want to find out about it may seem confusing. This #TuesdayTip is all about your community profile's subscriptions and notifications settings. Check out the links below for clear directions and how-to's. Community Links: ○ Power Apps ○ Power Automate ○ Power Pages ○ Copilot Studio     Back to Basics Tuesday Tip #9: All About the Community Galleries Have you checked out the library of content in our galleries? Whether you're looking for the latest info on an upcoming event, a helpful webinar, or tips and tricks from some of our most experienced community members, our galleries are full of the latest and greatest video content for the Power Platform communities. Find out more by following the links below. Community Links: ○Power Apps ○ Power Automate ○ Power Pages ○ Copilot Studio       Back to Basics Tuesday Tip #10: Community Support Whether you're a seasoned community veteran or just getting started, you may need a bit of help from time to time! If you need to share feedback with the Community Engagement team about the community or are looking for ways we can assist you with user groups, events, or something else, Community Support is the place to start. Community Support is part of every one of our communities, accessible to all our community members, so find out what it means for your community with our last #TuesdayTip. Community Links: ○ Power Apps ○ Power Automate ○ Power Pages ○ Copilot Studio     Thank you for your support for our #TuesdayTip series. We look forward to bringing you more tips and tricks to help make your community experience the best it can be!

December 2023 User Group Update: Welcoming New Groups and Upcoming Events

A new month means it's time to celebrate and welcome the new user groups that have joined our community. We are excited to announce that we have more than 8 New Groups, which is no surprise after the amazing Microsoft Power Platform Conference. This month, we are breaking them out by the different community categories. If your group is listed here, give this post a kudo so we can celebrate with you! Don't forget to take a look at the many events happening near you or virtually! It's a great time of year to connect and engage with User Groups both locally and online.   Please Welcome Our NEW User Groups   Power Platform: PowerIT User Group: Nottingham Power Platform User Group: Bergen Power Platform User Group: Danmark Nashville Power Platform User Group Microsoft Ambassador Program y Mujer Latina Technolochicas NCWIT Community Copilot Studio:  Copilot User Group Italia Dynamics365: Dynamics User Group AdriaticDynamic 365 Azerbaijan   December User Group Events   01 Dec 2023 Aprendiendo Desarrollo web, creando mi primer power app y power page. 01 Dec 2023 Q4 Hybrid Philadelphia Dynamics 365 & Power Platform User Group Meeting05 Dec 2023APAC Dynamics 365 FastTrack Bootcamp - BI and Analytics07 Dec 2023Bay Area Power Platform Meetup: Learn, Share, and Connect07 Dec 2023Indiana D365/AX December User Group Meeting07 Dec 2023Dynamics User Group Meeting: Houston09 Dec 2023 December '23 - NEW Power Apps User Group Meeting - Online 12 Dec 2023December Cleveland Power Platform User Group Meeting12 Dec 2023 RW2 Data Stewardship Open Forum Discussion 13 Dec 2023  Black Country Power Platform User Group - December 2023 - West Midlands  

November 2023 Community Newsletter

Welcome to our November Newsletter, where we highlight the latest news, product releases, upcoming events, and the amazing work of our outstanding Community members. If you're new to the Community, please make sure to follow the latest News & Announcements and check out the Community on LinkedIn as well! It's the best way to stay up-to-date with all the news from across the Power Platform and beyond.        This month's highlights:- - Our most active community members- Microsoft Power Up Program- Microsoft Community Days website - The latest blogs and more                 COMMUNITY HIGHLIGHTS Check out the most active community members of the last month. These hardworking members are posting regularly, answering questions, kudos, and providing top solutions in their communities. We are so thankful for each of you--keep up the great work! If you hope to see your name here next month, just get active! FLMikePstork1Nived_NambiarWarrenBelzSprongYeManishSolankiLaurensMwskinnermlcAgniusExpiscornovuscreativeopinion KatieAUinzil2kHaressh2728hafizsultan242douicmccaughanwoLucas001domliu   Power Up Program Click the image below to discover more about the amazing Microsoft Power Up Program, as Reem Omar, Abbas Godhrawala, Chahine Atallah, Ruby Ruiz Brown, Juan Francisco Sánchez Enciso, Joscelyne Andrade Arévalo, Eric G. and Paulina Pałczyńska share how non-tech professionals can successfully advance into a new career path using Microsoft #PowerPlatform.   To find out more about this amazing initiative, click here to apply for the program and reboot your journey into low-code app development today!     Community Days - Event Website Have you checked out the Community Days website yet? Dedicated to the volunteer community organizers around the world, Community Days is the perfect place to find an event near you or add an event for wider exposure. Many thanks to Thomas Daly, Sharon Weaver, Sedat Tum, Jonathan Weaver, Manpreet Singh, David Leveille, Jason Rivera, Mike Maadarani, Rob Windsor and the team for all their hard work. Anyone can host a Community Day on any topic relevant to our industry, just click the image below to find out more.       EVENT NEWS Power Platform French Summit - Paris/Virtual - 6-7th Dec It's not long now until the Power Platform French Summit, which takes place both virtually and in-person at the Microsoft France conference center in Paris on 6-7th December 2023. If you can't make it in-person, all sessions will also be broadcast on virtual networks for better distribution and accessibility.   There's a fantastic array of speakers, including Jérémy LAPLAINE, Amira Beldjilali, Rémi Chambard, Erika Beaumier, Makenson Frena, Assia Boutera, Elliott Pierret, Clothilde Facon, Gilles Pommier, Marie Aubert, Antoine Herbosa, Chloé Moreau, Raphaël Senis, Rym Ben Hamida, Loïc Cimon, Joséphine Salafia, David Zoonekyndt, Aïcha Charpentier, Henry Jammes, Milene Rochard, Mehdi EL YASSIR, and many more. Click the image below for more information.       LATEST COMMUNITY BLOG ARTICLES Power Apps Community Blog Power Automate Community Blog Copilot Community Blog Power Pages Community Blog

Unlocking the Power of Community: A Journey with Featured User Group leaders Geetha Sivasailam and Ben McMann

In the bustling world of technology, two dynamic leaders, Geetha Sivasailam and Ben McMann, have been at the forefront, steering the ship of the Dallas Fort Worth Power Platform User Group since its inception in February 2019. As Practice Lead (Power Platform | Fusion Dev) at Lantern, Geetha brings a wealth of consulting experience, while Ben, a key member of the Studio Leadership team at Lantern, specializes in crafting strategies that leverage Microsoft digital technologies to transform business models.   Empowering Through Community Leadership Geetha and Ben's journey as user group leaders began with a simple yet powerful goal: to create a space where individuals across the DFW area could connect, grow their skills, and add value to their businesses through the Power Platform. The platform, known for its versatility, allows users to achieve more with less code and foster creativity.   The Power of Community Impact Reflecting on their experiences, Geetha and Ben emphasize the profound impact that community engagement has had on both their professional and personal lives. The Power Platform community, they note, is a wellspring of resources and opportunities, fostering continuous learning, skill enhancement, and networking with industry experts and peers.   Favorite Moments and Words of Wisdom The duo's favorite aspect of leading the user group lies in witnessing the transformative projects and innovations community members create with the Power Platform. Their advice to aspiring user group leaders? "Encourage diverse perspectives, maintain an open space for idea-sharing, stay curious, and, most importantly, have fun building a vibrant community."   Building Bridges, Breaking Barriers Geetha and Ben encourage others to step into the realm of user group leadership, citing the rewarding experience of creating and nurturing a community of like-minded individuals. They highlight the chance to influence, impact, and positively guide others, fostering connections that extend beyond mere technology discussions.   Joining a User Group: A Gateway to Growth The leaders stress the importance of joining a user group, emphasizing exposure to diverse perspectives, solutions, and career growth opportunities within the Power Platform community. "Being part of such a group provides a supportive environment for seeking advice, sharing experiences, and navigating challenges."   A Year of Milestones Looking back at the past year, Geetha and Ben express pride in the group's growth and global participation. They recount the enriching experience of meeting members in person at the Microsoft Power Platform conference, showcasing the diverse range of perspectives and guest speakers that enriched the community's overall experience.   Continuous Learning on the Leadership Journey As user group leaders, Geetha and Ben recognize the continuous learning curve, blending interpersonal skills, adaptability, and dedication to foster a vibrant community. They highlight the importance of patience, persistence, and flexibility in achieving group goals, noting the significance of listening to the needs and suggestions of group members.They invite all tech enthusiasts to join the Dallas Fort Worth Power Platform User Group, a thriving hub where the power of community propels individuals to new heights in the dynamic realm of technology.

Back to Basics Tuesday Tip #10: Community Support

This is the TENTH post in our ongoing series dedicated to helping the amazing members of our community--both new members and seasoned veterans--learn and grow in how to best engage in the community! Each Tuesday, we feature new content that will help you best understand the community--from ranking and badges to profile avatars, from Super Users to blogging in the community. Our hope is that this information will help each of our community members grow in their experience with Power Platform, with the community, and with each other!   This Week: All About Community Support   Whether you're a seasoned community veteran or just getting started, you may need a bit of help from time to time! If you need to share feedback with the Community Engagement team about the community or are looking for ways we can assist you with user groups, events, or something else, Community Support is the place to start.   Community Support is part of every one of our communities, accessible to all our community members.     Power Apps: https://powerusers.microsoft.com/t5/Community-Support/ct-p/pa_community_support Power Automate: https://powerusers.microsoft.com/t5/Community-Support/ct-p/mpa_community_support Power Pages: https://powerusers.microsoft.com/t5/Community-Support/ct-p/mpp_community_support Copilot Studio: https://powerusers.microsoft.com/t5/Community-Support/ct-p/pva_community-support   Within each community's Community Support page, you'll find three distinct areas, each with a different focus to help you when you need support from us most.     Community Accounts & Registration is the go-to source for any and all information related to your account here in the community. It's full of great knowledge base articles that will help you manage your community account and know what steps to take if you wish to close your account.  ●  Power Apps  ●  Power Automate  ●  Power Pages, ●  Copilot Studio      Using the Community is your source for assistance with everything from Community User Groups to FAQ's and more. If you want to know what kudos are, how badges work, how to level up your User Group or something else, you will probably find the answers here. ●  Power Apps   ● Power Automate    ●  Power Pages  ●  Copilot Studio      Community Feedback is where you can share opportunities, concerns, or get information from the Community Engagement team. It's your best place to post a question about an issue you're having in the community, a general question you need answered. Whatever it is, visit Community Feedback to get the answers you need right away. Our team is honored to partner with you and can't wait to help you!   ●  Power Apps  ● Power Automate   ● Power Pages   ● Copilot Studio  

Microsoft Ignite 2023: The Recap

What an amazing event we had this year, as Microsoft showcased the latest advancements in how AI has the potential to reshape how customers, partners and developers strategize the future of work. Check out below some of our handpicked videos and Ignite announcements to see how Microsoft is driving real change for users and businesses across the globe.   Video Highlights Click the image below to check out a selection of Ignite 2023 videos, including the "Microsoft Cloud in the era of AI" keynote from Scott Guthrie, Charles Lamanna, Arun Ulag, Sarah Bird, Rani Borkar, Eric Boyd, Erin Chapple, Ali Ghodsi, and Seth Juarez. There's also a great breakdown of the amazing Microsoft Copilot Studio with Omar Aftab, Gary Pretty, and Kendra Springer, plus exciting sessions from Rajesh Jha, Jared Spataro, Ryan Jones, Zohar Raz, and many more.     Blog Announcements Microsoft Copilot presents an opportunity to reimagine the way we work—turning natural language into the most powerful productivity tool on the planet. With AI, organizations can unearth value in data across productivity tools like business applications and Microsoft 365. Click the link below to find out more.     Check out the latest features in Microsoft Power Apps that will help developers create AI-infused apps faster, give administrators more control over managing thousands of Microsoft Power Platform makers at scale, and deliver better experiences to users around the world. Click the image below to find out more.     Click below to discover new ways to orchestrate business processes across your organization with Copilot in Power Automate. With its user-friendly interface that offers hundreds of prebuilt drag-and-drop actions, more customers have been able to benefit from the power of automation.     Discover how Microsoft Power Platform and Microsoft Dataverse are activating the strength of your enterprise data using AI, the announcement of “plugins for Microsoft Copilot for Microsoft 365”, plus two new Power Apps creator experiences using Excel and natural language.       Click below to find out more about the general availability of Microsoft Fabric and the public preview of Copilot in Microsoft Fabric. With the launch of these next-generation analytics tools, you can empower your data teams to easily scale the demand on your growing business.     And for the rest of all the good stuff, click the link below to visit the Microsoft Ignite 2023 "Book of News", with over ONE HUNDRED announcements across infrastructure, data, security, new tools, AI, and everything else in-between!        

Top Solution Authors
Users online (2,702)