In my Test Environment I have a Power Automate that calls a child flow "Run a Child Flow".
In the dropdown I can select the Child Flow name and everything is working as expected.
Because I am importing my solution as a managed solution in the test environment I would like to set up an environment variable instead of selecting the Child Flow from the drop down.
I copied the run a child flow action to my clipboard and pasted it in notepad. I can see that the code refer to:
"operationName":"Run_a_Child_Flow","operationDefinition":{"type":"Workflow","inputs":{"host":{"workflowReferenceName":"e6631ffa-0dd0-ec11-a7b6-002248943c2a"}
So instead of selecting the Child Flow name from the dropdown I passed the GUID and everything works fine
Where can I get the GUID used for the workflowReferenceName because that is not the GUID of the workflow that you get from the URL when you edit the Child Flow.
Thanks
The first Microsoft-sponsored Power Platform Conference is coming in September. 100+ speakers, 150+ sessions, and what's new and next for Power Platform.
This training provides practical hands-on experience in creating Power Apps solutions in a full-day of instructor-led App creation workshop.
User | Count |
---|---|
183 | |
52 | |
41 | |
40 | |
34 |
User | Count |
---|---|
252 | |
81 | |
71 | |
66 | |
66 |